Inclined Lift Toni-Seelos Ski Jump Site Seefeld
WM-Sportanlagen Seefeld Tirol GmbH, Austria
On the occasion of the 2019 World Cup, the existing ski jump chairlift was replaced by a fully automatic passenger transport system to be operated by the passengers. The lift was designed and built as an inclined elevator and does not require its own operating staff.
The bottom stop is located in the area of the runout of the jumping facility at an altitude of about 1.200m. Near the judges’ tower, an intermediate stop was provided and another intermediate stop can be realized if necessary. The upper stop is located in the area of the access to the jump tower at an altitude of about 1.284m. The inclined elevator is used like a conventional elevator in a building.
The inclined elevator was built and put into circulation according to European Directive 2014/33 / EU. The putting into circulation has also been carried out in accordance with the Lift Safety Regulations 2015 – ASV 2015.
General
Year of Construction: 2017
System: Inclined Lift
Drive: Traction Drive
Topographical Data
Length: 183 m
Difference in Level: 84 m
Inclination: 39 – 20 °
Track
Rail Type: HEA-Träger
Rail Gauge: 1.400 mm
Operating Data
Load Capacity: 50 passenger
Travel Speed: 2 m/s
Capacity: ca. 559 pphd (pers./h/direction)